Re: Transfer of requirements to MRP

$
0
0

Hi Eric

 

I believe that what you want is the result of a new functionality introduced by note 1571800. Please make sure that this note is implemented into your system and check the description of this new

functionality provided on the note:

 

 

 

These changes add the field "Fixed Date and Qty" to the stock transfer

item. In the table control, the new column with the checkbox is

displayed at the very end.

 

 

[...]

 

 

You can use the checkbox "Fixed Date and Qty" to define that the

material requirements planning (MRP) is to refer only to confirmation

schedule lines after the availability check takes place. Accesses are

provided on the date that the availability check confirms in the

supplying plant. For underconfirmation, the confirmed dates and

quantities are different from the desired dates and quantities. You can

no longer carry out rescheduling for the relevant purchase order item.

 

If the note is already implemented on your system, you need to check the flag "Fixed Date and Qty", so that MRP should refer to the confirmed ATP dates.

 

BR
Caetano