Hi Anjan, Rob,
Have already checked the settings in SWEC. The On Change for Change Doc object BANF is tied to BUS2105->Changed event. Have attached an analysis of the various events generated during modifying the PR using ME52N. Also tried once using ME52. There is no Changed event triggered when Adding/Copying Line Item in ME52N. Pls advise.
Best Regards
Thiru